Use coupon code “SUMMER20” for a 20% discount on all items! Valid until 2024-08-31

Site Logo
Search Suggestions

      Royal Mail  express delivery to UK destinations

      Regular sales and promotions

      Stock updates every 20 minutes!

      The Cambridge to King’s Lynn Line: 30 Years of Electrification

      Out of stock

      Firm sale: non returnable item
      SKU 9781398115583 Categories ,
      Select Guide Rating
      Previously unpublished photographs documenting the many changes experienced by this railway line since electrification.
      Winter 1984/5 – the future for the Cambridge–King’s Lynn ‘Fen Line’ looked bleak. British Rail had singled long track sections. There had been c...

      £15.99

      Buy new:

      Delivery: UK delivery Only. Usually dispatched in 1-2 working days.

      Shipping costs: All shipping costs calculated in the cart or during the checkout process.

      Standard service (normally 2-3 working days): 48hr Tracked service.

      Premium service (next working day): 24hr Tracked service – signature service included.

      Royal mail: 24 & 48hr Tracked: Trackable items weighing up to 20kg are tracked to door and are inclusive of text and email with ‘Leave in Safe Place’ options, but are non-signature services. Examples of service expected: Standard 48hr service – if ordered before 3pm on Thursday then expected delivery would be on Saturday. If Premium 24hr service used, then expected delivery would be Friday.

      Signature Service: This service is only available for tracked items.

      Leave in Safe Place: This option is available at no additional charge for tracked services.

      Description

      Product ID:9781398115583
      Product Form:Paperback / softback
      Country of Manufacture:GB
      Title:The Cambridge to King's Lynn Line
      Subtitle:30 Years of Electrification
      Authors:Author: Mike Beckett
      Page Count:96
      Subjects:Trains and railways: general interest, Trains & railways: general interest, East Anglia
      Description:Select Guide Rating
      Previously unpublished photographs documenting the many changes experienced by this railway line since electrification.
      Winter 1984/5 – the future for the Cambridge–King’s Lynn ‘Fen Line’ looked bleak. British Rail had singled long track sections. There had been closure talk.Yet, following a vigorous three year political and technical campaign, government approval for its electrification was granted in February 1989. Construction work was drawn out and suffered setbacks, so it wasn’t until August 1992 that electric trains finally started operating on the 41-mile-long line. At first passengers were fairly thin on the ground, but as the years progressed growth (fuelled by commuting into Cambridge and, to a lesser extent, London) meant trains gradually became very overcrowded. Extensive works to upgrade the line to take longer trains have now come on stream. As well as a new Cambridge North, there are well-developed plans for other new stations.Concentrating mainly north of Cambridge, this book illustrates the trains that run from Kings Cross and Liverpool Street to Ely and King’s Lynn via Cambridge, many of the types and liveries seen, and the extensive infrastructure works that have taken place over the last thirty-or-so years.Mike Beckett was a strategic planner at King’s Lynn & West Norfolk Borough Council at the time of the electrification campaign. With a personal as well as professional interest in transport, he maintains a photographic record of the line’s many changes and has drawn on his collection to produce this book.
      Imprint Name:Amberley Publishing
      Publisher Name:Amberley Publishing
      Country of Publication:GB
      Publishing Date:2023-08-15

      Additional information

      Weight296 g
      Dimensions164 × 234 × 9 mm